Structures covered by the Statistics Canada building construction price indexes

Statistics Canada produces building construction price indexes for six non-residential structures. These comprise office, warehouse, shopping center, factory and school buildings, together with a bus depot that has maintenance and repair facilities. Statistics Canada also produces indexes for four residential structures. These are a single-detached house, a townhouse, and high-rise and low-rise apartment buildings. A high-rise apartment building has five stories or more, and a low-rise apartment building has fewer than five stories.

Contractor's price basis and reference base of the Statistics Canada indexes

Statistics Canada defines the contractor's price as the value of all materials, labor, equipment, overhead and profit required for a new building. The price excludes value-added taxes, real estate fees and the costs of land, land assembly, land development and building design. The indexes were rebased to 2023=100 when data for the third quarter of 2024 were published. At that point, table 18-10-0276 was archived and replaced by table 18-10-0289.

National building construction price changes in the second quarter of 2026

Statistics Canada reports a 0.5 percent increase in residential building construction costs in the second quarter of 2026. Those costs had increased 0.7 percent in the previous quarter. For non-residential buildings, costs rose 1.4 percent in the second quarter, after a 0.9 percent increase in the previous quarter. On a year over year basis, residential costs in the composite of 15 census metropolitan areas rose 2.3 percent in the second quarter. Non-residential costs rose 3.5 percent on the same basis.

At the composite level, Statistics Canada reports that non-residential building construction costs increased in every division it measured in the second quarter of 2026. The conveying equipment division recorded the largest increase, at 2.9 percent. The earthwork division and the structural steel framing division each rose 2.2 percent. The metal fabrications division rose 2.0 percent in the same quarter.

Price changes by census metropolitan area and the federal GST/HST rebate in Ontario

Statistics Canada reports that residential building construction costs rose in nearly all census metropolitan areas in the second quarter of 2026. Québec recorded the largest quarterly increase, at 2.6 percent, and Montréal followed at 2.5 percent. Halifax rose 2.1 percent, while Saskatoon and Regina each rose 2.0 percent. For non-residential buildings, Québec again recorded the largest increase, at 2.7 percent. Saskatoon and London each rose 2.1 percent, Montréal rose 1.9 percent and Regina rose 1.8 percent.

Statistics Canada also reports a factor noted by builders in Ontario. Uncertainty about how the federal GST/HST rebate would be implemented continued to delay purchasing decisions. The delay applied particularly to new homes. Developers and buyers were awaiting the legislation required to make rebate claims. That legislation came into effect on June 22, 2026.

Bank of Canada policy rate, inflation projection and cost pass-through in 2026

The Bank of Canada raised its overnight rate target to 2.5 percent in October 2026, an increase of 25 basis points. The deposit rate was set at 2.45 percent and the Bank Rate at 2.75 percent. The Bank of Canada reports CPI inflation of around 3 percent since April, linked to persistently high oil prices. A rise to about 3½ percent is expected by the end of 2026. Inflation excluding gasoline was 2.2 percent in September, and core inflation measures remain close to 2 percent.

The Bank of Canada expects CPI inflation to average 3 percent in 2027, one percentage point higher than its July projection. CPI inflation is then expected to fall to 2 percent by the middle of 2028. In the projection, energy prices that stay higher for longer and increased pass-through make inflation more persistent.

The Bank of Canada Business Outlook Survey for the third quarter of 2026 reports that roughly half of firms plan to pass on cost increases. Those firms plan to pass some or all of the increases tied to tariffs and the war in the Middle East on to customers. The share of firms with such plans is higher than in the previous quarter.

Key points

  • Statistics Canada produces building construction price indexes for six non-residential and four residential structures, rebased to 2023=100.

  • The contractor's price covers materials, labor, equipment, overhead and profit, and excludes value-added taxes and land, design and real estate costs.

  • Statistics Canada reports that costs for non-residential buildings rose 1.4 percent and costs for residential buildings rose 0.5 percent in the second quarter of 2026.

  • The Bank of Canada raised its overnight rate target by 25 basis points to 2.5 percent in October 2026.

  • Roughly half of firms in the third quarter 2026 Business Outlook Survey plan to pass on tariff and Middle East war cost increases.

References

Statistics Canada. Building construction price indexes, second quarter 2026. 2026-07-24. https://www150.statcan.gc.ca/n1/daily-quotidien/260724/dq260724b-eng.htm

Bank of Canada. Bank of Canada raises the policy rate by 25 basis points to 2½%. 2026-10-28. https://www.bankofcanada.ca/2026/10/fad-press-release-2026-10-28/

Bank of Canada. Business Outlook Survey: Third Quarter of 2026. 2026-10-19. https://www.bankofcanada.ca/2026/10/business-outlook-survey-third-quarter-of-2026/

General information only. This article is not legal, engineering, financial, tax or other professional advice and does not create an advisory relationship. It relies on the references listed above, whose content may have changed since publication and has not been independently verified by the firm. It was prepared with automated drafting tools and automated quality controls. To request a correction or removal, please use the Contact page.

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page