RESOLUTION · DISPUTE RESOLUTION

Quantum and damages

Cost of delay and disruption, and valuation of disputed changes.

WHAT IT IS

The service

Quantum and damages assesses the amount that a party is owed or owes: the cost of delay, the cost of disruption to planned work, and the value of changes whose price is disputed.

Each sum is calculated from the project’s cost ledgers, payroll records, plant records and subcontract accounts. It is valued under the valuation rules in the contract and checked for duplication between heads of claim.

The valuation supports a claim or its rebuttal, a negotiated settlement or proceedings before a tribunal. It is prepared with counsel where counsel is engaged, and every figure is traceable to its source. Under our policy, on any one matter we provide either advice to a party or independent expert evidence, not both.

SUMMARY

PRACTICE

WHEN

At any time

ENGAGEMENT

As a separate engagement, or as part of a wider engagement

For a time-critical matter, mark your inquiry as urgent and state the deadline.

WHEN CLIENTS NEED IT

▸

Prolongation costs have been claimed, and the time-related site overheads and head office costs must be valued.

▸

Disruption to the planned sequence has increased labor and plant costs, which must be separated from the effects of other causes.

▸

The two parties’ assessments of the value of a disputed change differ widely.

▸

A lender, funder or counsel needs an independent assessment of the sums claimed and the sums in issue.

WHAT YOU RECEIVE

Deliverables

The heads of claim to be valued and the presentation format are agreed at the outset.

01

Quantum review

An assessment of the cost records available, the valuation rules in the contract and the heads of claim they can support.

02

Prolongation cost valuation

The time-related costs of each period of delay, valued from actual cost records and linked to the findings of the delay analysis.

03

Disruption cost valuation

The additional labor and plant cost caused by each disrupting event, measured against comparable unaffected work or planned resources where the records allow.

04

Valuation of disputed changes

The value of each disputed change under the contract’s rates, fair valuation or cost-based rules, with the quantities and prices substantiated.

05

Quantum report and calculation schedules

A written report with calculation schedules that trace each figure to its source document and show any duplication removed.

HOW WE WORK

Each figure traced from source record to total

Quantum follows entitlement and causation, so each sum is linked to the event that caused it and to the contract rule that values it.

STEP 01

Identify the heads

Identify each head of claim or loss, the contract basis for recovery and the valuation rule that applies to it.

STEP 02

Verify the cost records

Reconcile cost ledgers, payroll, plant and subcontract records to the accounts, and record any gaps or estimates relied on.

STEP 03

Value and cross-check

Value each head, link it to the findings on delay or on the event, and remove duplication between heads of claim.

STEP 04

Present the quantum

Set out the figures, assumptions and alternatives in calculation schedules that the other party, counsel or the tribunal can audit.

Standards and frameworks applied

Applied where fit for purpose, in line with the client’s requirements and the contract.

APPLIED IN RESOLUTION

▸

AACE International Recommended Practices

▸

The Society of Construction Law Delay and Disruption Protocol

▸

Ciarb practice guidelines

APPLIED ACROSS ALL PRACTICES

▸

Standard forms of contract such as FIDIC, NEC, CCDC, AIA and ConsensusDocs, and non-standard contracts

▸

The laws, regulations, codes and procurement rules that apply to each project

▸

The IBA Rules on the Taking of Evidence in International Arbitration

▸

The rules of the institution or adjudication body named in each contract

WHEN IT IS USED

At any time

Standalone service

Resolution is not tied to a project phase. A client can engage it at any time, on its own or alongside Insight and Clarity, whether or not Constrata Consultants was previously engaged on the project.

Usual starting points: independent report, claim, counterclaim and defense.

RELATED SERVICES

Services often engaged together

RELATED EXPERIENCE

Where this service applies

Projects our professionals have worked on in sectors where this service is commonly engaged.

INDUSTRIAL AND MANUFACTURING

Industrial production complex

Value band

$25M to $500M

OIL AND GAS

Refinery expansion

Value band

$25M to $500M

Notices, claims and adjudications are subject to time limits set by the contract and by applicable law. Contacting us does not give notice to anyone and does not stop a time limit, so take the steps that a deadline requires yourself. Where a matter needs legal advice or representation in a proceeding, our work supports the client’s legal counsel.

An expert’s duty is to the court or tribunal, not to the party that gives the instructions. Before we accept instructions, we check for conflicts and disclose any relationship that could reasonably be seen to affect independence. Each expert must disclose any such relationship or interest to us. Under our policy, we do not give expert evidence on a matter where we have provided consulting support to a party or acted as contract administrator on the project. No fee for expert evidence depends on the outcome.

Send an inquiry

Tell us about the project, the records and the timetable. Your inquiry reaches the Resolution practice.