WHAT IT IS
The service
Value engineering and value management assess whether a design provides the functions the owner requires at an appropriate cost. Structured workshops and reviews take place at set points in Pre-Design and Design, or before the owner decides to proceed.
Function analysis distinguishes what each element of the project must do from how it is currently designed. Alternatives are then generated and evaluated on function, cost and risk, with the cost plan as the reference.
Specialist engineers and other specialists analyze the design, assess and cost the alternatives, and prepare the report. The design may come from a contractor or another consultant, or be based on an earlier similar project. The design team decides which changes to make, and the owner approves them.
SUMMARY
PRACTICE
Phases
Pre-Design
Design
ENGAGEMENT
As a separate engagement, or as part of a wider engagement
Tell us about the project and the question.
WHEN CLIENTS NEED IT
▸
The owner wants a design reviewed for value before deciding to proceed.
▸
The cost plan exceeds the approved budget and the owner needs options that preserve the required functions.
▸
The owner’s requirements are not yet settled and stakeholders disagree on what the facility must achieve.
▸
A contractor developing a design proposal wants alternatives assessed for cost and risk before pricing.
▸
A funder’s approval depends on evidence that the design has been reviewed for value at each stage.
WHAT YOU RECEIVE
Deliverables
The number of workshops, the participants and the reporting format are agreed with the owner and design team.
01
Workshop plan
The participants, information required, functions to be studied and timetable for each workshop or review.
02
Function analysis
A record of the functions each system or element must perform, ranked by importance and compared with its current cost.
03
Option appraisal
Each alternative described, costed and scored on function, cost and risk, with any effect on the schedule noted.
04
Value review report
The findings on the design as presented, the options proposed and the reasons for each, set out for the owner’s decision to proceed and for approval of changes.
05
Implementation log
A log tracking accepted options through design development, with the cost plan updated as each is incorporated.
HOW WE WORK
Structured workshops at defined design stages
Value studies are scheduled at the design stages at which a change still costs little. Each study starts from function, not specification, and every option is costed before it is proposed.
STEP 01
Prepare the study
Gather the owner’s requirements, the design or the earlier project on which it is based, and the cost plan, and agree on the scope, team and decision rules.
STEP 02
Analyze function
Identify what each element must do, what it costs, and where cost is high relative to the function it serves.
STEP 03
Develop and evaluate
Generate alternatives with the design team and specialist engineers, and score each on function, cost and risk.
STEP 04
Report and record decisions
Report the findings and the options accepted or rejected, and incorporate the accepted options into the cost plan.
Standards and frameworks applied
Applied where fit for purpose, in line with the client’s requirements and the contract.
APPLIED IN INSIGHT
▸
AACE International Recommended Practices
▸
RICS professional standards
▸
CIQS guidance
APPLIED ACROSS ALL PRACTICES
▸
Standard forms of contract such as FIDIC, NEC, CCDC, AIA and ConsensusDocs, and non-standard contracts
▸
The laws, regulations, codes and procurement rules that apply to each project
▸
ISO standards
▸
SAVE International Value Methodology Standard and comparable international value management standards
PROJECT PHASES
When this service applies
Pre-Design
Design
01
Pre-Design
Business case, budget and delivery strategy
02
Design
Baselines for cost, schedule and risk as the design develops
RELATED SERVICES
Services often engaged together
RELATED EXPERIENCE
Where this service applies
Projects our professionals have worked on in sectors where this service is commonly engaged.
EDUCATION
University research building
Value band
$500M to $1B
WATER AND WASTEWATER
Water treatment plant
Value band
$25M to $500M