WHAT IT IS
The service
Cost control and earned value management controls project cost against the approved budget and forecasts the final cost. It measures the earned value of work performed against both the planned value and the actual cost.
The control budget is broken down by work package and cost code and linked to the schedule, so that commitments, actual costs and progress are recorded on the same basis. The structure is established in Pre-Design, so that the budget is controlled from its first approval.
Variance reports and forecasts give owners, contractors and funders early notice of cost trends and a documented basis for corrective action.
SUMMARY
PRACTICE
Phases
All phases
ENGAGEMENT
As a separate engagement, or as part of a wider engagement
Tell us about the project and the question.
WHEN CLIENTS NEED IT
▸
A budget has been approved, but there is no structure for tracking commitments and actual cost against it.
▸
The forecast final cost changes every month, and the reasons for each change are not explained.
▸
A contract or funding agreement requires earned value reporting on cost and schedule performance.
▸
A contractor needs to know which packages are losing margin well before the final account.
WHAT YOU RECEIVE
Deliverables
Reporting periods, level of detail and format are agreed at the outset with those who rely on the reports.
01
Control budget
The approved budget broken down by cost code and work package, with contingency and allowances shown separately.
02
Cost reports
Periodic reports of budget, commitments, actual cost, approved and pending changes, and forecast final cost.
03
Variance analysis
An explanation of each significant variance between budget, forecast and actual cost, with its cause and the action proposed.
04
Earned value reports
Planned value, earned value and actual cost by period, with the cost performance index, the schedule performance index and the estimate at completion.
05
Baseline change log
A record of each approved change to the cost baseline, with its source, value and approval, tracing the current budget to the original budget.
HOW WE WORK
One baseline for cost and schedule
Cost and progress are measured against one performance measurement baseline, so that a cost variance and a schedule variance can be analyzed together.
STEP 01
Set the cost baseline
Break the approved budget into control accounts aligned with the schedule and the cost codes used for reporting.
STEP 02
Record and measure
Collect commitments, actual costs and measured progress at each period end from the client’s records, on the same basis as the baseline.
STEP 03
Analyze variance
Compare earned value with planned value and actual cost, identify the causes of each variance and assess the forecast against them.
STEP 04
Report and revise
Issue the cost and earned value reports, and update the cost baseline only through approved changes.
Standards and frameworks applied
Applied where fit for purpose, in line with the client’s requirements and the contract.
APPLIED IN CLARITY
▸
AACE International Recommended Practices
▸
PMI standards for project, program, portfolio and risk management
▸
CMAA Construction Management Standards of Practice
APPLIED ACROSS ALL PRACTICES
▸
Standard forms of contract such as FIDIC, NEC, CCDC, AIA and ConsensusDocs, and non-standard contracts
▸
The laws, regulations, codes and procurement rules that apply to each project
▸
ISO standards
▸
Recognized earned value management guidelines
PROJECT PHASES
When this service applies
All phases
In Pre-Design the service establishes the budget structure against which cost is subsequently reported.
01
Pre-Design
Business case, budget and delivery strategy
02
Design
Baselines for cost, schedule and risk as the design develops
03
Procurement
Tendering, evaluation, negotiation and award
04
Construction
Progress, cost and change controlled against the approved baselines
05
Post-Construction
Final account, closeout and lessons learned
RELATED SERVICES
Services often engaged together
RESOLUTION
View service
RELATED EXPERIENCE
Where this service applies
Projects our professionals have worked on in sectors where this service is commonly engaged.
OIL AND GAS
Gas processing plant
Value band
$25M to $500M
MINING
Mine expansion
Value band
Over $1B